Levelapartment renovation · since 2011
+7 495 120-40-40Get an estimate

Turnkey apartment renovation · Moscow

Renovation where all is level

The estimate is fixed in the contract, the deadline is on the calendar, the site is in your phone. Delivered on time 14 years running.

  • 312 projects delivered
  • 0 days of delay
  • the price doesn't change after signing
Hallway8.2 Bathroom5.4 Kitchen12.3 Living room24.6 Bedroom16.8 Kids' room13.1 Study11.6 12 4007 600

Hover over a room. Total 92.0 , 7 rooms.

Project
3-room apartment, 92.0 m²
Stage
Working drawings
Scale
1:100
Sheet
1 of 12

An estimate in a minute

Price your renovation without calling anyone

Move the area, pick the type and the options. The number in the estimate is the one that goes into the contract: we don't recalculate after measuring.

Renovation type

Options2 selected

Estimate No. 1543-054preliminary
Area
54
Major
17 900 /
Electrics from scratch
97 200
Floor screed
70 200
Total labour

1 134 000

21 000 per

Turnkey time11 weeks

Labour without materials. The exact estimate comes after a free measurement, but it won't be higher than this one.

Work stages

12 weeks by the calendar, not «as it goes»

Scroll — the marker moves through the weeks the way the site does. Every stage starts on its own date, and you see it in the contract.

Stage / week
Demolition
Partitions
Electrics, rough
Plumbing, rough
Screed and plaster
Tiling
Ceilings and painting
Floors and doors
Finishing and handover
Stage 1 of 9 · wk 11

Demolition

We strip everything down to concrete and remove the waste the same day. Neighbours get a letter three days ahead.

crew: Igor + 3

A sample schedule for a 54 m² major renovation. Your schedule — after measuring, the same day.

Projects

Drag the curtain — see the difference

One angle before and after. We shoot the photos ourselves on handover day, no retouching and no «stylist».

Two-room on Leninsky: after renovationTwo-room on Leninsky: before renovationbeforeafter
Area
62 m²
Type
Major
Time
11 wk
Labour
1.28M ₽

A 1974 panel building. Removed the built-in wardrobes, moved the kitchen into the former pantry, levelled the screed by 4 cm.

Live site

You see the site every day, not «when you come by»

The foreman posts a report with photos every evening, the on-site camera runs around the clock. This is what the client's dashboard looks like right now.

camera live
loading

Three-room on Polezhaevskaya, 78 m²

Start
Handover
Now
Tiling, painting
Next
Floors — from Monday
  1. day 4510:00

    Door installation

    Six concealed-frame leaves, the frames are already in.

    plan
  2. day 4110:00

    Laying the floor in the bedroom and study

    Floating on 2 mm underlay, 10 mm gap at the walls.

    plan
  3. day 3809:40

    Grouting in the guest bathroom

    Rinat finished tiling the walls, epoxy grout today. The hatch under the bath is an inspection one, 30×40, hidden.

    Grouting in the guest bathroomIgor, foreman
  4. day 3718:10

    Heating pressure test — 10 bar, holding

    An hour and a half under pressure, no drop. Report signed, gauge photo in the chat.

    Artem, plumber
  5. day 3612:25

    Engineered wood delivered

    Oak «Natur», 28 boxes, acclimatising in the bedroom. Screed moisture 2.1% — can lay from Monday.

    Engineered wood deliveredIgor, foreman
  6. day 3417:00

    Second coat of filler in the living room

    Sanding under a lamp tomorrow, primer for paint on Thursday. Colour NCS S 1002-Y — sample on the wall by the window.

    Olga, painter

Why us

How we differ from «a crew from an ad»

Not promises — contract clauses. Every line can be checked before signing.

  • 0projects delivered
  • 0days of delay in 14 years
  • 0%of estimates didn't grow after signing
CriterionLevelA typical crew
Price fixed in the contract«roughly»
Deadline on the calendar with stage dates
Penalty for delay — 0.5% per day
Daily photo report and a cameraon request
Hidden work accepted with a report
Site cleaned every evening
Warranty5 yearsverbal
Payment by stage, no 50% upfront

An excerpt from the standard contract, 2026 edition. Full text on request before measuring.

Crew

Our own people, not «whoever's free»

Six people who have worked together for over seven years. No subcontracting: on site are those whose names are in the contract.

  • Igor Savelyev

    Foreman, crew lead

    • 14 years' experience
    • 312 delivered

    Responsible for the schedule, acceptance of hidden work and the daily report. His phone number is in the contract.

    now on Polezhaevskaya
  • Dmitry Klyuev

    Electrician, certified up to 1000 V

    • 11 years' experience
    • 204 delivered

    Panels, low-voltage, smart home. Every line is labelled and on the diagram.

    now on Polezhaevskaya
  • Artem Gusev

    Plumber

    • 9 years' experience
    • 176 delivered

    Manifold runs, pressure tests with a report, underfloor heating.

  • Marat Ibragimov

    Tiler, floors

    • 12 years' experience
    • 158 delivered

    Large format, 45° porcelain, engineered wood, herringbone parquet.

    now on Leninsky
  • Olga Terekhova

    Painter

    • 8 years' experience
    • 120 delivered

    Filler for paint without «streaks under a lamp», butt-joined wallpaper, microcement.

  • Rinat Valeev

    Carpenter, fitting

    • 7 years' experience
    • 96 delivered

    Hidden doors, built-in furniture to the project, boxing and niches.

Acceptance reports

What clients write on handover day

Quotes from acceptance reports over the past year. We don't hide remarks: if there were any — we write how we closed them.

  • Acceptance report No. 0298Two-room on Leninsky, 62 m²14.08.2026
    Delivered two days early. Photos in the chat every evening, I never once drove over to check. They'd have re-laid the bathroom tiles if I'd asked — no need.
    Anna R.Client's signature
  • Acceptance report No. 0291Three-room in Skolkovo, 96 m²02.07.2026
    The designer from the studio said it was the first time a crew got hidden doors right first time. The estimate didn't grow by a rouble, even though we added sockets.
    Kirill and MariaClient's signature
  • Acceptance report No. 0284Studio on Taganka, 31 m²19.05.2026
    Cosmetic in four weeks, as promised. Cleaned up after themselves — handed over a clean apartment, I moved tenants in the same day.

    Remark: a scratch on the windowsill — replaced in two days, before signing the report

    Oleg N.Client's signature
  • Acceptance report No. 0277Four-room in Khamovniki, 134 m²28.03.2026
    They got the replanning approved themselves, I only signed. Foreman Igor replies within an hour even on a Sunday — that's a value of its own.
    Dmitry V.Client's signature
  • Acceptance report No. 0269Two-room on Rechnoy, 54 m²11.02.2026
    My first renovation, I was scared of everything. A contract with stage dates and a penalty calmed me better than any words. Everything matched to the day.
    Polina S.Client's signature
  • Acceptance report No. 0260One-room in Lyublino, 38 m²23.12.2025
    Electrics redone from scratch, the panel labelled by line. I'm an engineer myself, there was nothing to fault — and I tried.

    Remark: asked them to work quietly before 10:00 — the schedule was shifted from day one

    Sergey K.Client's signature

Request

Measuring is free, the estimate — the same day

We come with a laser meter and send the estimate with stage dates within two hours. A contract — only if the numbers suit you.

We'll call back within 15 minutes, 9:00 to 21:00

No newsletters: one call or one message, to the point.